Scenario
The 9-story jewel-box designed building wanted to offer their residents with modern amenities that matched its richly modern finish and design. During construction the developer contacted EverCharge to assist in bringing EV charging service to every resident.
Solution
EverCharge installed 2 electrical panels, one on each floor, in the garage then ran the necessary conduit to each residents parking space. Without EverCharge the building would be capped at 9 charge stations to service the entire community, however by leveraging EverCharge’s industry leading expertise and technology all 75 residents can now bring EV charging service directly to their space at minimal cost.